Verification

Quality and inspection

Quality is not a final inspection. It is a chain: material checked on arrival, first article signed off before the run continues, patrol inspection through the batch, and a CMM report at the end. Break any link and the report at the end means nothing.

Send a drawing

The inspection chain, in order

StageWhat is checkedWho signs it
Incoming materialAlloy, temper, size, mill certificateQuality
First article (FAI)Full dimensional report against the drawing revisionSenior inspector
In-process patrolCritical features through the batch, at defined intervalsPatrol inspector
Final CMMDatum-referenced features on the inspection planCMM inspector
DocumentationFAI, balloon drawing, CMM report, material certQuality

Two patrol inspectors walk the floor during production, one full-time CMM inspector runs the metrology room, and a senior inspector owns the first-article sign-off. Three people on inspection is not a cost we hide — it is why the scrap rate sits around one percent.

What we measure with

Every instrument below is in the building and in calibration. The range matters as much as the name: a 0–150 mm caliper cannot check a 300 mm dimension, and a 16–80 mm boring head cannot touch a 12 mm bore.

InstrumentRange / typeWhat it is for
Mitutoyo digital caliper0–150 mm, 0–200 mmGeneral dimensions, quick checks
Outside micrometer0–25, 25–50, 50–75, 75–100 mmShaft diameters, thickness
Bore gauge (internal dial)6–10, 10–18, 18–35, 35–50 mmInternal diameters in the bore
Inside micrometer5–30, 25–50 mmLarger bores where a bore gauge will not reach
Lever dial indicator0.002 mm graduationRunout, concentricity on the machine
Lever test indicator0.001 mm graduationDatum setup, indicating a fixture
Dial / digital indicator0.01 mm and 0.001 mmFlatness on a surface plate, height
Thread plug gauge, metricM1–M20, 6HInternal metric threads, go / no-go
Thread plug gauge, imperial#6–7/8, 2B classInternal UNC/UNF threads, go / no-go
Go / no-go gauge±0.01 mm, 1–20 mmFast pass/fail on diameters
Reamer setØ1–20 mm, held to 0.01 mmH7 bores, dowel holes, pin fits
Fine boring headØ16–80 mm, held to 0.01 mmPrecision bores, correcting position
Boring head, fine16–80 mmPrecision bores, correcting position
Profile projectorOptical, 10× / 20×Small features, thread form, radii
Hexagon CLASSIC CMMGranite table, PH10 headPosition, flatness, perpendicularity, true position

The CMM is the arbiter for anything the drawing ties to a datum. Calipers are for the shop floor, not for acceptance — a 0.02 mm caliper reading on a ±0.02 mm tolerance is not a measurement, it is a guess.

The four documents you get

ReportWhat it containsWhen you need it
First article inspection (FAI)Every dimension on the drawing, one part, signedNew part, new revision, new supplier
Full dimensional FAIEvery dimension plus notes on method and instrumentSupplier qualification, regulated industries
Balloon drawingThe drawing with numbered callouts matching the reportTraceability between report and drawing
CMM reportMeasured values against nominal and tolerance, by featureDatum-referenced features, capability checks

Every product gets a first-article report. That is not an upsell — it is the default, because a part that has not been measured is not a part we can defend. If your receiving team wants a specific format, send it with the drawing and the report is issued in your format.

Scrap rate: about 1%

Across a thousand parts, roughly ten are scrapped. That number is not zero, and a supplier who claims zero is either not measuring or not counting.

What matters is where the scrap comes from and what happens next. Most of it is first-article and setup scrap — the first part off a new fixture, the trial cut after a program change. Once a run is proven, the rate drops sharply, which is why the second and tenth batches are more predictable than the first.

When a part is out of tolerance, it is not shipped as conforming. We report the deviation with the measured values and propose rework, replacement or a concession for your engineering team to decide. The decision stays with you; the measurement is ours.

ISO 9001: what the certificate actually covers

The quality management system is certified to GB/T 19001-2016 / ISO 9001:2015 by Hangzhou Standard Service Certification Co., Ltd. (CNAS C273-M, IAF member), certificate no. 41625Q00023R001, valid 19 December 2025 to 18 December 2028.

The certified scope is production of metal inspection tools and general mechanical metal parts. That is narrower than “we do everything”, and it is worth reading before you assume a certification we do not hold. If your program requires AS9100 or ISO 13485 from the supplier, raise it at first contact — it is a qualification question, not a machining question.

Registration details and certificate · How to read a CMM report

FAQ

Do you inspect every part?
Every part gets a first article. After that, critical features are measured on a defined sample agreed at quotation, with patrol inspection through the run. 100% inspection is possible and priced.
What reports can you provide?
First article, full dimensional FAI, balloon drawing and CMM report. Material certificates are available on request, traceable to the heat number.
What happens if a dimension is out of tolerance?
The part is not shipped as conforming. We report the deviation with measured values and propose rework, replacement or a concession — the decision is your engineering team’s.
What is your scrap rate?
Around 1% — roughly 10 parts per 1,000. Most of it is first-article and setup scrap rather than steady-state production.
Can you work to our inspection plan?
Yes. Send the plan or the report format with the drawing, and the report is issued against it using the instruments listed above.

Have a drawing to review?

Send the model, the revision and the quantity. You get a written review of the open items with the price.

Send a drawing →

Privacy policy