CNC machining China
Buying machined parts from China is a supply-chain decision before it is a price decision. The quote that is 8% lower usually has one line missing — and you find out at goods-in, not at quotation.
Send a drawing How to compare quotesWhat you are actually buying
Not a part. You are buying a supplier’s attention to your drawing, and a documented trail you can show your own quality team. Two shops can machine the same drawing to the same tolerance and deliver very different experiences: one answers a drawing question in four hours with a marked-up PDF, the other answers in three days with “we can do it”.
The part that matters most is not the machining. It is what happens when something goes wrong at the tenth batch — because at volume, something always does. The question to ask a Chinese supplier is not “can you make this”, it is “what do you do when a dimension comes out of tolerance”. If the answer is vague, the price is irrelevant.
How a Chinese machining quote is built
A single number cannot be compared. Ours separates five lines, and you should ask every supplier to do the same — a quote without a breakdown is a quote you cannot audit.
| Line | What it should say | What a suspicious quote does |
|---|---|---|
| Material | Alloy, temper, stock size, unit price per kg | “Included” — and 7075 is quietly swapped for 6061 |
| Setup and programming | Number of operations, whether a fixture is built | Zero, because it is buried in the unit price |
| Machining time | Cycle minutes × shop rate | Not shown, so you cannot see the quantity break |
| Finishing | Type, thickness, masking, batch minimum | “Anodized” with no type and no colour reference |
| Inspection | Reported features, sample size, FAI or not | Omitted — and omitted means none |
The most common gap is finishing. Anodizing has a batch minimum and a colour tolerance; if the quote is silent on type (II vs III) and on masking, the cheap quote is cheap because it assumed the easiest possible finish.
Incoterms and what the landed cost actually is
The unit price is a fraction of the landed cost. Freight, duty and the cost of a bad batch usually dwarf the difference between two quotes.
| Term | Supplier handles | You handle | When it makes sense |
|---|---|---|---|
| EXW | Packing only | Pickup, export clearance, freight | You have a forwarder in Ningbo already |
| FOB Ningbo | Delivery to port, export clearance | Ocean freight, insurance, duty | The default for most first orders |
| CIF | Freight and insurance to your port | Import clearance, duty, inland | Small shipments, no forwarder relationship |
| DDP | Everything to your door | Nothing but the invoice | Prototypes and small parcels; expect a margin built in |
Two things people underestimate. Air freight for prototypes is often cheaper than waiting three weeks for a sea container on a project with a deadline. And duty is assessed on the declared value — an under-declared invoice is a problem for the importer, not the supplier.
Payment terms and where the risk sits
The standard structure is a deposit with the balance against inspection documents. That is normal and it is not a red flag. What matters is what the deposit is secured against.
- First order: 30–50% deposit, balance against photos and dimensional report before shipment. Never pay the balance before you have seen the report.
- Repeat order: negotiate net terms once the relationship is proven — 30 days from shipment is common after three clean orders.
- Large tooling spend: milestone payments against fixture photos rather than a single upfront payment.
- Red flag: a supplier who asks for 100% upfront on a first order, or who will not accept a third-party inspection.
Drawings, IP and the NDA question
Your drawing is your IP. A supplier who will not sign an NDA before receiving it is telling you something. Ours is signed before the first file is sent, and files are not passed to third parties for quoting.
Three practical protections, in order of strength: an NDA with a named legal entity (not a trading company), a drawing that omits the assembly context so a single part cannot be reverse-engineered into your product, and a supplier whose business is contract machining rather than selling their own catalogue.
If your part is genuinely novel, split it: send the geometry to the machinist and keep the function to yourself. It costs nothing and removes the most common leak path.
What to verify before the first order
| Check | How to verify it | Why it matters |
|---|---|---|
| Legal entity | Unified social credit code, checked against the goods on the invoice | A trading company quoting as a factory is a margin layer, not a capability |
| ISO 9001 scope | Read the scope on the certificate, not just the logo | The scope tells you what is actually certified |
| Inspection equipment | Photo of the CMM with its nameplate, or a video call | “We have CMM” is a claim; a nameplate is evidence |
| Capacity | Number of machines, shifts, and whether your part fits the work envelope | Capacity that cannot reach your part size is not capacity |
| Reference parts | Photos of similar parts, ideally with the finish you need | Shows whether they machine your family of work |
Lead time, honestly
Quoted lead time is usually machining time. The real number includes finishing, inspection and freight, and each has its own queue.
| Stage | Typical | What stretches it |
|---|---|---|
| Drawing review and quote | 1 business day | Unclear tolerances, missing alloy, revision mismatch |
| Material procurement | 2–5 days | Non-stock alloy or unusual thickness |
| Machining | 3–7 days | Fixture build, first article inspection |
| Finishing | 3–7 days | Anodizing batch queue, colour matching |
| Inspection and packing | 1–2 days | Reported features, FAI documentation |
| Freight | 3–5 days air / 25–35 days sea | Port congestion, customs holds |
The honest way to plan: ask for the date the parts leave the factory, then add freight. A supplier who gives you a door-to-door date without knowing your forwarder is guessing.
Ten questions that separate factories from traders
- What is your legal entity name and credit code? (Then check it.)
- Which processes run in your own building, and which are subcontracted?
- What is your largest work envelope, and can my part fit it?
- How many setups will my part need, and why?
- What tolerance will you commit to in writing on this specific feature?
- Which instrument measures that feature, and what is its uncertainty?
- What do you do when a dimension is out of tolerance — rework, replace, or ask for a concession?
- Who answers technical questions, and in what language?
- Can I see the inspection report for the last similar part you ran?
- What is your on-time delivery rate for the last six months?
A factory answers these in specifics. A trader answers them in adjectives.
Working across the time zone
Ningbo is UTC+8. A question sent at the end of the European day is answered at the start of the next one; a question sent from the US west coast is answered the same morning in China. Drawing review is asynchronous by design, which is why the written review matters more than a call — you can forward it to your engineering team and it does not evaporate.
What breaks the rhythm is not the time zone, it is a question with no drawing attached. Send the file in the first message and the loop closes in a day.
FAQ
- How do I compare two Chinese machining quotes?
- Ask both for the five-line breakdown: material, setup, machining time, finishing, inspection. If one cannot produce it, it is not comparable, regardless of the number at the bottom.
- Is a cheaper quote always a risk?
- Not always — a shop with the right machine and the right fixture can genuinely be cheaper. The risk is a quote that is silent on finishing and inspection, because those are the two lines most often dropped to win on price.
- What Incoterm should I use for a first order?
- FOB Ningbo for anything over a parcel, because it keeps freight visible and lets your forwarder handle the ocean leg. DDP is fine for prototypes where the simplicity is worth the built-in margin.
- Do I need to visit the factory?
- For a first order over a few thousand dollars, a visit or a video audit answers more than any document. Ask to see the machine your part will run on, and the CMM.
- How is IP protected?
- NDA with the legal entity before files are shared, drawings that omit assembly context, and a supplier whose business is contract machining rather than a catalogue of its own products.
Keep reading
Precision machining
What a tight tolerance actually requires at the machine.
ReadAluminum machining
Alloy choice, thin walls and the anodizing build.
ReadQuality and inspection
The CMM behind the report, and what it measures.
ReadCost breakdown
The five lines inside a machining quotation.
ReadThe RFQ checklist
What to send so the first reply is usable.
ReadAbout the company
Legal entity, factory address and ISO scope.
ReadHave a drawing to review?
Send the model, the revision and the quantity. You get a written review of the open items with the price.
The sourcing details, one page each
Five decisions decide what a Chinese order really costs. Each has its own page.
Incoterms
EXW, FCA, FOB, CIF, DAP, DDP — where cost and risk split.
ReadFactory audit
What to verify from a desk, and the live video walk-through.
ReadPayment terms
Deposit, balance, L/C and what the balance is secured against.
ReadFreight
Sea, air or express, and why machined parts arrive damaged.
ReadTariffs and compliance
HS codes, origin, declared value, RoHS and REACH.
ReadPreparing an RFQ
The package that gets a usable quote first time.
ReadRunning a supplier relationship
From the first sample to a repeat program: what to agree, what to record and what to verify.
Supplier onboarding
Five stages from RFQ to production.
ReadSample approval
What a sample proves, and the golden sample.
ReadQuality audit
What predicts failure, and how to follow up.
ReadIP protection
NDA, partial drawings and the assembly context.
ReadTooling ownership
Fixtures, gauges and the register.
ReadLead time
What to trade, and where to hold buffer.
Read